The answers and their sources.

Original text from the fictional Cedar conversation, observed 28 October 2026. These records support the worked example; they are not customer results.

Return to the worked example

Read the complete answers

Capacity-first answer
From the selected engagement records

Capacity-first working note (concise)
Latest relevant sources and versions: capacity CSV v3 (02-capacity.csv, version 3) for available hours; planning note v3 (03-planning-note.txt, version 3) for reconciled availability and demand; forecast CSV v1 (01-forecast.csv, version 1) for recorded planning jobs. (Sources: E1-SRC-02, E1-SRC-03, E1-SRC-01.)
Current values (per admitted sources):
Available hours: 340 hours (capacity CSV v3; planning note confirms 340 and supersedes earlier 320 and 360) (E1-SRC-02; E1-SRC-03).
Estimated effort per job: 5 hours per job (recorded in capacity file and noted as unvalidated) (E1-SRC-02; E1-SRC-04).
Confirmed demand: 72 jobs (planning note separates confirmed demand) (E1-SRC-03).
Provisional demand: 12 jobs (provisional; planning total 84 = 72 + 12) (E1-SRC-03; E1-SRC-01).
Superseded values: earlier availability figures 320 and 360 hours are explicitly replaced by the 340-hour value in the planning note and should be treated as historical, not current (E1-SRC-03).
Arithmetic (modelled capacity, using same-week inputs):
Modelled capacity = available_hours / estimated_hours_per_job = 340 / 5 = 68 jobs (E1-CALC; E1-SRC-02).
Comparison:
Confirmed demand (72) vs modelled capacity (68): shortfall of 4 jobs.
Full planning case (72 confirmed + 12 provisional = 84) vs modelled capacity (68): shortfall of 16 jobs.
Notes: estimated hours per job is unvalidated; provisional release dates and job-level effort remain unconfirmed (E1-SRC-03; E1-SRC-04; E1-REPORT).

Reviewer’s next question:

Which specific jobs are provisional and what are their proposed release dates and job-level effort estimates (so we can test sensitivity to job mix and timing)? (E1-SRC-03)

Draft conclusion (two cautious sentences):

Under the current, unvalidated 5-hrs-per-job estimate and the reconciled 340 available hours, the arithmetic model shows capacity for 68 jobs, leaving a 4-job shortfall against confirmed demand and a 16-job shortfall against the full planning case. Validate hours-per-job, job mix and provisional release dates before using these numbers for any operational commitments or staffing decisions (E1-SRC-02; E1-SRC-03; E1-SRC-04; E1-REPORT).
SOURCES
E1-SRC-02 Cedar Review · fictional UI walkthrough · Capacity planning review · 02-capacity.csv
E1-SRC-03 Cedar Review · fictional UI walkthrough · Capacity planning review · 03-planning-note.txt
E1-SRC-01 Cedar Review · fictional UI walkthrough · Capacity planning review · 01-forecast.csv
E1-SRC-04 Cedar Review · fictional UI walkthrough · Capacity planning review · 04-method-note.md
E1-CALC Cedar Review · fictional UI walkthrough · Capacity planning review · Deterministic calculation from admitted files
E1-REPORT Cedar Review · fictional UI walkthrough · Capacity planning review · Working report v7 (approval verified)
OPEN
Cedar Review · fictional UI walkthrough · Evidence
Cedar Review · fictional UI walkthrough · Review
Answered 28 Oct, 04:16 pm
Download original text
Evidence-first answer
From the selected engagement records

Evidence-first review — Cedar capacity planning (same facts retained)

Lead: mandatory validations before any commitment

Confirm the reconciled current available-hours figure (340) is the operative value and not a lingering contradictory record: planning note v3 states 340 and explicitly replaces earlier 320 and 360 figures (E1-SRC-03). The capacity CSV v3 records 340 hours (E1-SRC-02). Treat the older numbers as superseded historical values unless evidence shows otherwise (E1-SRC-03).
Validate the estimated effort per job (5 hours) because it is explicitly unvalidated in the admitted materials; the arithmetic model (340 / 5 = 68) depends on this estimate and does not constitute measured delivery capability (E1-SRC-02; E1-SRC-04; E1-CALC).
Resolve job mix and release-date uncertainty: confirmed demand (72 jobs) and 12 provisional jobs (planning total 84) are separated in the planning note, but provisional release dates and job-level effort remain unconfirmed — this affects whether provisional work should be scheduled (E1-SRC-03; E1-SRC-01).

Keep the arithmetic and counts unchanged: modelled capacity = 340 / 5 = 68 jobs; confirmed demand = 72 jobs; provisional = 12 jobs (planning total 84) (E1-CALC; E1-SRC-02; E1-SRC-03).

Three prioritized checks (in order)
Check: empirical validation of hours-per-job
What it would resolve: confirms whether 5 hours per job is a reasonable operational estimate or requires adjustment; directly changes the modelled capacity (E1-SRC-02; E1-SRC-04).
Check: authoritative confirmation that 340 hours is the current, reconciled available capacity for the target week
What it would resolve: removes the risk of acting on a superseded figure (320 or 360) and ensures supply-side planning uses the single operative input (E1-SRC-03; E1-SRC-02).
Check: verification of provisional jobs’ release dates and job-level scope/job-mix
What it would resolve: determines whether the 12 provisional jobs should be treated as schedulable in the target week or kept separate; clarifies if job mix would change average effort per job (E1-SRC-03; E1-SRC-01).

Cautious two-sentence draft conclusion

Under the admitted inputs the arithmetic model gives 68 modelled jobs (340 hours / 5 hours per job) versus 72 confirmed jobs and 84 in the planning case, implying a shortfall of 4 for confirmed demand and 16 for the full planning case. Before any operational commitment, validate the hours-per-job estimate, confirm 340 as the authoritative available-hours figure, and verify provisional release dates and job mix so the model reflects supported evidence rather than unvalidated assumptions (E1-SRC-02; E1-SRC-03; E1-SRC-04; E1-CALC).

SOURCES
E1-SRC-02 Cedar Review · fictional UI walkthrough · Capacity planning review · 02-capacity.csv
E1-SRC-03 Cedar Review · fictional UI walkthrough · Capacity planning review · 03-planning-note.txt
E1-SRC-04 Cedar Review · fictional UI walkthrough · Capacity planning review · 04-method-note.md
E1-SRC-01 Cedar Review · fictional UI walkthrough · Capacity planning review · 01-forecast.csv
E1-CALC Cedar Review · fictional UI walkthrough · Capacity planning review · Deterministic calculation from admitted files
OPEN
Cedar Review · fictional UI walkthrough · Evidence
Cedar Review · fictional UI walkthrough · Analysis
Answered 28 Oct, 04:17 pm
Download original text

Check the source material

The file versions refer to different records. They are not competing version numbers for a single document.

The saved review/export example elsewhere in the kit is report v7 on source v5. This Chat comparison uses the engagement’s underlying files. A saved accepted review is not acceptance of a different output or a new buyer’s case.