Give the team one task to learn with ChatGPT or Claude, such as preparing a weekly status note. Ask the person who checks that work to help choose the examples and describe what a good result looks like.
Run the task together, including the corrections, before inviting more people. Colleagues who already use the tools can show what works for them. Build on that experience.
Start with the ambition and the people doing the work
Ask what the business wants to make possible and invite the people involved to show a recent case. They may want more time for client conversations, a more consistent handover or an easier way to find a current answer. Avoid presenting AI use itself as the goal.
Describe one complete task: what starts it, which inputs it uses, what it produces, who checks it and what happens next. Capture how it works now, including review and correction. That baseline gives the team a fair comparison later.
Our first-workflow guide includes a candidate worksheet if there are several places to start. Choose a task small enough to inspect, with a result that would matter.
Agree a rollout brief before inviting more people
If columns don't fit, scroll sideways. Keyboard: focus the table and use the arrow keys.
| Decision | Record in the brief |
|---|---|
| Purpose | The useful result and who benefits |
| Task boundary | Trigger, output and what remains outside the test |
| Ownership | Sponsor, day-to-day operator, reviewer and administrator |
| Sources | Permitted material, current versions and who maintains it |
| Actions | What the tool may prepare and what requires approval |
| Success | Written acceptance criteria and evidence to collect |
| Exceptions | What to do when information or access is missing |
| Operation | Who maintains instructions, handles questions and can stop use |
Do not fill unknowns with reassuring assumptions. Give each material unknown an owner and a check. You may discover the task needs better instructions or a current template before it needs AI.
Choose the account and access arrangement
Work out which account or workspace owns company work, who administers membership and what happens when a person leaves. Check the provider's current plan, contractual and data-processing terms against the actual task. Where staff already use individual accounts, first inventory the existing use.
OpenAI's business-data page describes its default treatment of business data. That is one input to the decision; your permission to process a customer's material and your obligations for storage, retention and access still need checking.
Agree access before connecting a large document collection. Prefer the smallest useful source set and permissions needed for the task. Confirm access with the actual roles that will operate and review it, rather than relying solely on an administrator's successful test.
Build the test pack before teaching a shortcut
Select permitted examples that represent the work, including cases that should stop. Write the acceptable behaviour for each before looking at the generated answer.
For an internal policy-summary task, a compact pack might contain:
- A current, complete policy and an ordinary question.
- A question whose answer is absent from the permitted material.
- Two conflicting versions, only one of which is approved.
- A request to make a customer commitment outside the task's authority.
- A case where the operator cannot access the relevant source.
These are suggested case types, not a claim that five tests prove safety or suitability. Add cases that reflect the task's consequences. Record failures, revise the design and rerun affected cases. A successful ordinary example does not cancel a failed permission check.
Anthropic's Building effective agents supports starting with the simplest adequate approach. Its tooling examples date from 2024; the useful principle here is to justify added complexity with evidence. Many first tasks need clear instructions and good review rather than an autonomous agent.
Ready for a person to decide. The draft has its source beside it. The customer lead checks the wording, edits it and decides what to send.
Read both paths
Complete information: customer request and approved policy → prepared draft with source → customer lead reviews → ready to send if approved.
Conflicting policy: customer request and conflicting sources → draft withheld → policy owner resolves the source → draft is prepared again for human review.
A fictional teaching example, not a client result or a live ChatGPT or Claude session. The handover does not send a message automatically.
Train the whole job, including correction
Let people practise a case using the proposed arrangement. Training should cover finding the right source, making the request, checking the output, correcting it and completing the handover. Show what a held case looks like and where to ask for help.
Use a short practice record:
Task and source version: [ ]
What the tool prepared: [ ]
What I checked and changed: [ ]
What I could not establish: [ ]
Reviewer decision and next step: [ ]
This gives the operator something more useful than a list of clever prompts. Ask where the method feels awkward and change it with the team. If people need to copy the same material through several applications, investigate the process rather than assuming they need more encouragement.
A fictional rollout decision
The following is illustrative, not a client case or an implementation timetable.
A team tests preparation of internal meeting follow-up. The tool may organise permitted notes into a draft action list. A person must confirm names, commitments and dates before sharing it.
In practice, the draft is easy to read, but an ambiguous note becomes a confident deadline. The team changes the instruction and review checklist: uncertain dates are left visibly unresolved. It adds that case to the test pack and checks the next revision.
The useful decision is whether this complete arrangement now supports acceptable work. It is not whether everyone has logged in or whether the draft looks professional. The review step is part of the design, not an inconvenience to remove from the measurement.
Expand when the evidence supports it
Compare the whole task with the baseline: accepted output, operator effort, review, corrections, exceptions and running cost. Ask whether people can operate the arrangement without the original designer beside them. The measurement guide shows how to keep these categories separate.
Decide to continue, revise, simplify or stop. If you expand, identify what changes: sources, users, volume, actions or consequences. Recheck the affected boundaries. A tested internal drafting task does not automatically authorise customer sending or record updates.
Hand over something the team can maintain
Keep the task instructions, source register, access owners, test cases, review method and recovery steps together. Record who can change them and how a change will be checked. Agree any ongoing support separately.
Who keeps this working?
Which part of the job would pause if the usual operator were away? Use this card to record who can take over and what they need. One person may cover several responsibilities. Name cover only where it is needed and authorised; for some responsibilities, the right fallback is to pause the work and tell a named person.
Blank continuity card. Fill it in with the people who do the work.
If columns don't fit, scroll sideways. Keyboard: focus the table and use the arrow keys.
| Responsibility | Usual owner | Cover or fallback |
|---|---|---|
| Wants the result and decides whether it's still worth doing | ||
| Runs it each time | ||
| Checks each output before it's used | ||
| Sorts out incomplete or stuck work | ||
| Looks after sources and access |
Handover location: where the instructions, test cases and this card are kept.
Practise one awkward case. Ask the cover person to run the task from the handover notes while the usual operator stays out of it. Or use a permitted practice copy that deliberately leaves out one expected input. Write down what went wrong and what you changed. A completed card doesn't prove the workflow is ready for every situation. A practised case shows the team can recover from one.
Source ownership and freshness are covered in using company knowledge with AI. If people are still working from their own accounts, start with moving a team off personal AI accounts.
A fictional continuity card: weekly project status
Fictional example. The consultancy and its people are invented to show how the card works. This is not a client case.
A small environmental consultancy prepares an internal status note for each active site-assessment project every Thursday. The office coordinator gathers the permitted field notes and the approved tracker view, and uses the team's AI workspace to prepare a draft. The project lead checks it and decides what goes to the client. Nothing is sent or updated automatically.
Completed fictional continuity card.
If columns don't fit, scroll sideways. Keyboard: focus the table and use the arrow keys.
| Responsibility | Usual owner | Cover or fallback |
|---|---|---|
| Wants the result and decides whether it's still worth doing | Director | Senior project lead |
| Runs it each time | Office coordinator | Backup coordinator |
| Checks each output before it's used | Project lead for each job | Senior project lead |
| Sorts out incomplete or stuck work | Field team leader, for missing site or lab updates | Project lead holds the item and notes it in the draft |
| Looks after sources and access | Operations manager, for the project tracker and shared folder | Director |
Handover location: the shared ‘Weekly status’ folder, linked from the team channel.
Practice case and what changed: in the practice copy, the backup coordinator could see the draft but lacked access to its source view. She held the incomplete items and asked the source owner which approved view she could use. They recorded the permitted route in the handover note. When a lab result was missing on the next practice run, she flagged it for the field team leader before review.
A person still decides. The coordinator prepares the internal draft from permitted sources. The project lead checks it and decides what goes to the client.
- Wants the result
- Director
- Keeps it working
- Coordinator runs; project lead checks; field team leader handles missing updates; operations manager looks after sources and access. An authorised backup uses only approved views.
Read both paths and the access boundary
Field notes and the permitted tracker view go to the coordinator, who prepares a draft. The project lead checks it and decides what goes to the client. If an update is missing, the coordinator holds the affected items and asks the field team leader. If the backup cannot access a source, the source owner confirms an approved route or the work stays on hold. Nothing is sent or updated automatically.
Fictional weekly-status example. The person who wants the result and the people who keep the work running have different responsibilities.
Our ChatGPT + Claude Implementation service works through these decisions with your people. A free 25-minute Fit Call establishes fit and a useful next step; implementation, dependencies and acceptance are scoped in writing before you commit.