Records to inspect
Public source dates, approved proposition and claims, story permissions, editorial approval and publication receipt.
MKT.1–MKT.4 · Example design
Turn a relevant signal into a sourced, rights-cleared insight that an editor can issue—or decline.
Typical sponsor: Practice and growth leads. This is an illustrative route. It is not an installed workflow or a promise that this path is one of your three Blueprint designs.
Select any stage to inspect what it receives and produces, which specialist role might assist, what it may access, and who makes the human decision.
Scroll the diagram horizontally, or use the stage buttons below.
Practice lead owns this step.
Return path: Claim or rights rejected sends work from Issue decision to Claim basis.
Less repeated public research and fewer unsupported claims are hypotheses to test. Reach is not evidence of collected revenue.
Public source dates, approved proposition and claims, story permissions, editorial approval and publication receipt.
Unsupported claim or missing permission returns to source review; wrong audience or consent stops distribution.
Test ordinary, unsupported-claim, no-rights, retired-source and wrong-recipient cases; inspect source, rights and issue receipts.
These roles are candidate responsibilities in the reference architecture. They are not prebuilt products or active agents in your systems.
Investigate one approved public question.
Boundary: Sanitised brief and public sources only; no confidential case context.
Compare a draft with the original permitted evidence and exact request.
Boundary: Read-only comparison; a discrepancy report is never professional sign-off.
Prepare an article, proposal or client section from approved findings.
Boundary: Approved template, claims and versioned sources; draft remains private until review.
Show the next owner, dependency or proposed follow-up.
Boundary: One current case state; routine effects require separate delegation and receipt.
A Blueprint starts with a service the firm already sells, examines permitted records and measures the constrained work. It selects three connected boundaries, designs each to the same depth and ranks the first installation. A reference path may change, narrow or be rejected when the evidence is different.
Inspect the System Blueprint ↗