Skip to main content
Build n Bloom

Get what you already have working for the business.

You already have a system. Part of the business was meant to run on it, and it is half‑built, or it breaks.

We take on systems we did not build. We start from what you need yours to do, before what is wrong with it. Then a Technical Review puts two to three days inside your systems and comes back with a written list. Every item has a definition of done and a day estimate. You hold that list before any repair is bought.

Book a Fit Call

A 25‑minute call. No files, no homework. A written note either way.

‘Absolute godsend of team, helped us repair a lot of automations that we tried to build ourselves. Understood what made HVAC jobs so different!’

Abdallah Jassir, Google review.

An HVAC business.

Example job. The business shown is not a client.

A review comes first
Build n BloomFor Wexcombe Joinery

A review comes first, and takes two to three days

A Technical Review answers three things: what is there, what is broken, and what it would take. It comes first for any system we did not build.

At the end of it you hold:

  • A prioritised backlog.
  • A definition of done for each item.
  • A day estimate for each item.

The fee for the review is credited against your first block of Engineering Days.

A definition of done says what must be true for an item to count as finished. With the estimates beside it, you can see the size of the work before a day of it is bought.

Build n BloomFor Wexcombe Joinery

Prioritised backlog

Technical Review

No.Item / Definition of done
1Workshop scheduleA whiteboard and a spreadsheet. Agree one.
2Photos of finished jobsOn three phones. Agree one folder first.
3Price list kept currentEach change needs an owner and a date.
Build n BloomFor Wexcombe Joinery

Engineering Day

Date
10 November
Work
Work from the backlog, in priority order.
No.Item
1Workshop schedule
A whiteboard and a spreadsheet. Agree one.
Hours
ClientPatPat, owner

A short daily note.

A weekly summary.

Engineering Days work down that list in order

Engineering Days work down that list in order

Engineering Days are prepaid blocks of days. They suit software work that is not one job. It has no single accepted output, and a backlog defines it.

In a block you get:

  • Work from the backlog, in priority order.
  • A definition of done for each item.
  • A short daily note.
  • A weekly summary.
  • Single days, once a block has run.
Build n BloomFor Wexcombe Joinery

Prioritised backlog

Technical Review

No.Item / Definition of done
1Workshop scheduleA whiteboard and a spreadsheet. Agree one.
2Photos of finished jobsOn three phones. Agree one folder first.
3Price list kept currentEach change needs an owner and a date.
Build n BloomFor Wexcombe Joinery

Engineering Day

Date
10 November
Work
Work from the backlog, in priority order.
No.Item
1Workshop schedule
A whiteboard and a spreadsheet. Agree one.
Hours
ClientPatPat, owner

A short daily note.

A weekly summary.

Sometimes the answer is a Build

Sometimes the answer is a Build, or a Programme

If the review shows the work is one job with one output, we quote a Build. If the work is ongoing, it is a Programme.

We are on call only under Care for inherited systems

We are on call only under Care for inherited systems

Care for inherited systems keeps something we did not build running, after we have fixed it. It is quoted after the Technical Review.

Outside that Care, we do not take on-call responsibility for a system we did not build.

The guarantee has a section for day‑rate work

The guarantee has a section for day-rate work

The written guarantee has its own section for Technical Reviews and Engineering Days.

The backlog shows the size before you pay for days

The backlog shows the size before you pay for days

Every item carries a day estimate, so the size of the work is in writing first. Engineering Days are bought as blocks and paid for in advance. Care for inherited systems is quoted after the Technical Review.

Build n BloomFor Wexcombe Joinery

Prioritised backlog

Technical Review

No.Item / Definition of done
1Workshop scheduleA whiteboard and a spreadsheet. Agree one.
2Photos of finished jobsOn three phones. Agree one folder first.
3Price list kept currentEach change needs an owner and a date.
Prioritised backlog
Example job. The business shown is not a client.

Bring what you have and what it was for

Tell us what is there and what you need it to do. Twenty‑five minutes with a founder, free, and a written note either way.

Fit Call

Fit Note

Build n BloomFit Call

Fit Note

  1. What we saw
  2. What you told us
  3. What we think might be true
  4. What we do not know
  5. One useful next step
Written byBuild n Bloom

To keep whether or not you proceed.